Large industrial complexes often have many fired heaters, making broad-based competency in this area essential to overall reliability, safety and energy efficiency. Despite industry’s widespread familiarity with fired heaters, they continue to pose many common challenges in reliable operation and control.
APC 1.0 made the situation more complicated and less reliable by dividing heater controlled variables (CVs) between the BPC and APC layers. The most fundamental consequence of this compromise has been the use of the temperature controller as the primary MV rather than direct multivariable control of the fuel gas valve itself.
Now APC 2.0, i.e. APC in the base-layer, can streamline multivariable heater control in one high-speed high-availability multivariable control application deployed at the control layer to increase fired heater control performance and reliability.
Read about heater control by APC Performance LLC in Chemical Engineering magazine.
Get in touch
Contact APC Performance for a site-wide Fired Heater BPC Health Audit
Safety, reliability, and optimization are the main challenges facing the process industries today, and process control is one of the most important tools to these ends.
APC Performance LLC offers services designed to help clients rapidly achieve top quartile Basic Process Control (BPC) and Advanced Process Control (APC) core-competency.
APC Performance, LLC Box 984 Red Lodge, Montana 59068 This email address is being protected from spambots. You need JavaScript enabled to view it. 406-426-0803